  • Tenant Improvement Contractors in Orlando and Central Florida: Scope, Timeline, Permits
Teal two-story commercial building with exposed yellow housewrap and silt fencing during construction in Central Florida.

A lease is signed. The space is empty, or it belongs to someone else’s old concept. Now it has to become your restaurant, clinic, office or store. That work is a tenant improvement (TI), often called a tenant build-out, and the contractor you hire decides whether it opens on time and on budget.

Sunrise Buildworks is a Florida certified building contractor (license CBC1269216) serving Orlando and Central Florida, including Orange, Osceola, Seminole, Brevard, Lake, Polk, Pinellas and Hillsborough counties. This guide covers what tenant improvement contractors actually do, how a project moves from lease to certificate of occupancy, where permits fit, and what to ask before you hire.

What a tenant improvement contractor does

A tenant improvement contractor converts leased commercial space to suit a specific occupant. The work ranges from cosmetic refreshes to full interior construction. Typical scope includes:

  • Demolition of existing walls, ceilings and finishes
  • New framing, drywall and ceilings
  • Electrical, plumbing and HVAC changes
  • Flooring, paint, millwork and storefront work
  • Fire protection and life-safety updates
  • Specialty items such as kitchen hoods, exam rooms or retail fixtures

If you search for “construction buildout” or “commercial build out contractors,” you are looking for the same service. Some owners use “tenant improvement” for work funded by the landlord and “build-out” for work funded by the tenant, but contractors use the terms interchangeably.

Shell conditions: what you start with

The starting condition of the space changes the scope. A vanilla shell typically has basic walls, a slab and rough utility stubs. A second-generation space was previously occupied and may need demolition or reuse of existing systems. Always walk the space with your contractor before you finalize a budget, and ask your landlord for a written description of the delivery condition.

The tenant build-out process, step by step

1. Site walk and field verification

A good contractor measures and documents existing conditions before design starts. That prevents surprises behind walls and above ceilings.

2. Design and preconstruction

You need drawings for permitting. You may hire an architect and engineers directly, or use a design-build contractor to manage design and construction under one contract. See our overview of design-build construction if you want a single point of responsibility.

3. Budget and bids

Your contractor should break pricing into trade categories, list allowances, and state exclusions in writing. Ask what happens if existing conditions require changes after demolition.

4. Permitting

Most tenant improvements need a building permit from the city or county where the property sits. Orlando, Orange County, Seminole County and other jurisdictions each have their own submittal process and review times. Contractors usually submit plans, answer review comments and track resubmissions.

Florida also generally requires a Notice of Commencement to be recorded for improvements above a statutory dollar threshold (see Florida Statutes Chapter 713).

5. Construction

Construction worker on a boom lift at the upper facade of a teal commercial building during construction in Central Florida.

After the permit is issued, trades mobilize. A project manager and superintendent coordinate sequencing, inspections and delivery of long-lead items such as storefront glass, switchgear or kitchen equipment.

6. Inspections and turnover

The jurisdiction inspects the work at several points. When it passes final inspection and the certificate of occupancy or completion is issued, the contractor delivers close-out documents, which commonly include warranties and as-built drawings.

How long does a tenant improvement take?

Timelines depend on size, complexity, permit review and material lead times. A small cosmetic refresh moves quickly. A restaurant or medical build-out with new mechanical, plumbing and specialty equipment takes longer.

What drives schedule most:

  • Permit review. It often takes longer than owners expect, so submit as early as possible.
  • Long-lead materials. Electrical gear, storefronts and kitchen equipment can set your opening date.
  • Design changes. Changes after permitting add review time and cost.
  • Landlord approvals. Lease exhibits often require landlord sign-off on plans and contractors.

For a retail-specific view, read our guide to the retail tenant improvement timeline.

Budgeting: what moves the price

We do not publish a one-size price because every space is different. Cost per square foot depends on:

  • Starting condition of the space
  • Scope of mechanical, electrical and plumbing work
  • Finish level and specialty equipment
  • Permit and inspection requirements
  • Whether the landlord provides a tenant improvement allowance

If your lease includes a TI allowance, find out how it is paid out, what it covers and what the deadline is. Many landlords reimburse after work is complete and lien waivers are delivered. Our guide to tenant improvement allowances covers this in more depth.

Specialty build-outs

Some occupancies bring extra requirements. Restaurant build-outs add kitchen exhaust, grease interceptors and health department review. Medical and dental build-outs involve plumbing, medical gas, shielding and accessibility details. Ask your contractor for experience with your specific use, and ask to see comparable completed work.

How to choose a tenant improvement contractor

Check the license

In Florida, contractors who take on commercial building work must hold the appropriate state license. Verify any contractor’s license status on the Florida DBPR website. Sunrise Buildworks’ license number is CBC1269216.

Ask about local permitting experience

A contractor who regularly works with Orlando, Orange County and Seminole County building departments will anticipate comments and avoid rework. Sunrise also serves Osceola, Brevard, Lake, Polk, Pinellas and Hillsborough counties.

Compare scope, not only price

Two bids can differ by thousands because one excludes items the other includes. Ask each bidder for a written scope, allowances, exclusions and schedule.

Confirm communication and reporting

Ask who your project manager will be, how often you will get updates, and how change orders are documented.

Ask for references

Request recent projects of similar size and use, and speak with the owners or property managers. Our questions to ask a general contractor in Orlando is a ready checklist.

Get a tenant improvement estimate

If you have a lease or a space under consideration, send us the address, intended use, approximate square footage and your target opening date. We will walk the space and provide a written scope and estimate. Request a TI estimate or call (321) 248-4181.

Frequently asked questions

What is the difference between tenant improvement and build-out?

In practice, they describe the same work: altering leased commercial space for a specific occupant. Some use “tenant improvement” for landlord-funded work and “build-out” for tenant-funded work.

Do I need a licensed general contractor for a tenant improvement in Florida?

Commercial construction work generally requires a properly licensed contractor, and permits are pulled in the contractor’s name. Verify licensing with the Florida DBPR.

How long do permits take for a tenant build-out?

Review times vary by jurisdiction and project complexity. Submit early, respond to comments quickly, and ask your contractor for current expectations in your city or county.

Who pays for tenant improvements, the landlord or the tenant?

It depends on the lease. Some leases provide a TI allowance from the landlord, and the tenant pays costs above it. Others require the tenant to fund the entire build-out.

Can I stay open during construction?

Sometimes, depending on scope. Work in an occupied building may require phasing, after-hours work and dust and noise controls. Discuss this early.

Does Sunrise Buildworks serve areas outside Orlando?

Yes. We serve Orange, Osceola, Seminole, Brevard, Lake, Polk, Pinellas and Hillsborough counties from our Cocoa, Florida office.